Laboratory specifications, in full
Complete chemical and physical analysis for every commodity, verified against international benchmarks.
Syrian Phosphate
| Component | Grade 4 (%) | Grade 6 (%) |
|---|---|---|
| BPL | 64 – 66 | 62 – 64 |
| P₂O₅ | 29.29 – 30.21 | 28.38 – 29.29 |
| CaO | 48 – 50 | 48 – 50 |
| Fe₂O₃ | 0.10 – 0.20 | 0.10 – 0.20 |
| Al₂O₃ | 0.10 – 0.15 | 0.10 – 0.15 |
| MgO | 0.50 – 0.80 | 0.70 – 1.00 |
| SiO₂ | 7.5 – 9 | 7.5 – 9 |
| F | 2 – 4 | 2 – 4 |
| Cl | 800 – 1200 ppm | 800 – 1200 ppm |
| CO₂ | 7 – 9 | 7 – 9 |
| L.O.I | 7 – 8 | 7 – 8 |
| H₂O | 5 – 7 | 5 – 7 |
| P₂O₅ solubility, Citric Acid | 35 – 40% | 35 – 40% |
| P₂O₅ solubility, Formic Acid | 55 – 65% | 55 – 65% |
| Cu (ppm) | 10 – 15 | — |
| Zn (ppm) | 140 – 200 | — |
| U (ppm) | 40 – 70 | — |
| Hg (ppm) | < 0.1 | — |
| Cd (ppm) | 6 – 10 | — |
| V (ppm) | 70 – 150 | — |
| As (ppm) | < 2 | — |
| Ni (ppm) | 10 – 15 | — |
| Pb (ppm) | < 2 | — |
| Bi (ppm) | 0.01 – 0.05 | — |
Loading operation: electrical loading system and belt conveyor, Tartous Port. Vessel size 3,000–20,000 MT. Analysis method: sedimentary.
Silica Sand
SiO₂ content and detailed impurity analysis are pending laboratory confirmation and will be published once available. SSMC does not publish unverified laboratory figures.
-
High purity, quarry-mined deposit — not extracted from the Euphrates River
-
Low iron content and impurities (typical range on request)
-
Uniform grain size suitable for industrial processing
Saudi Premium Grade Clinker
| Component | % |
|---|---|
| SiO₂ | 20.90 |
| Al₂O₃ | 4.91 |
| Fe₂O₃ | 3.89 |
| CaO | 65.50 |
| MgO | 2.00 |
| SO₃ | 0.70 |
| Cl⁻ | 0.008 |
| Alkali Eq. | 0.76 |
| LOI | 0.30 |
| IR | 0.30 |
| f.CaO | 1.30 |
| C₃S | 61.50 |
| C₂S | 15.00 |
| C₃A | 6.50 |
| C₄AF | 12.00 |
| Liter Weight (gm/ltr) | 1200 |
| Retained @ 30 mm Sieve (%) | 5 |
| Passing @ 1.0 mm Sieve (%) | 15 |
Complies with EN 197-1 (CEM I 52.5 N & R) and ASTM C-150 (Type I). Supplier identity is withheld at this stage.
Euphrates River Sand
An upgraded river-suction dredger design has been developed to expand extraction capacity; it is a concept in development, alongside the currently operating extraction unit. Capacity figures are being finalized and will be confirmed before publication.
Consistency, checked against international benchmarks
Clinker is tested against EN 197-1 and ASTM C-150. Phosphate specifications follow the reference standards of Syria's General Company for Phosphate & Mines.
